Équinoxe Daniel-Johnson (Phase 2) 

Équinoxe Daniel-Johnson (phase 2)

March 10, 2023 

For this project, we hired a mechanical engineer and supplied and installed the following plumbing systems: 

  • Sanitary drainage system 
  • Rainwater drainage system 
  • Domestic water piping 
  • Natural gas piping 

ORAM Expertise 

Our team was tapped early on in the design process and we leveraged our expertise to help finalize the plans faster and get the building permit. 

We also helped the mechanical engineer plan out the pipe layout as well as the layout and location of the boiler rooms according to where the city water and gas lines were. 

Statistics 

211 

units 

800 

taps 

Équinoxe Daniel-Johnson (phase 2)

Source: ORAM